Building permits, country by country
By SendFair. Updated 2026-11-15.
The permit line uses that country's own published fee. It is not a Nairobi fee converted into another currency. If no tariff was published, the line stays and the price is left blank.
The fee is not the same kind of charge everywhere
Nairobi prices a plan approval as a percentage of a county construction rate, plus an occupation certificate and a public-health vetting fee. Kampala prices inspections by the ground-floor area and adds VAT. Kigali and Rwanda use a floor-area band. Johannesburg charges by the square metre.
Egypt's line is the insurance deposit in the building law, worked out from the ministry's deemed cost. The governor's own issuing fee is not added, because the current decision was not in the check.
A blank price is deliberate
Lusaka and Addis Ababa require a permit. A current residential tariff was not published in a form that could be quoted, so the line is not filled with a guess.
Open the country on the calculator and read that permit line. The source is under the list.