What the house total includes
By SendFair. Updated 2026-11-15.
The total includes the structure, the finish, the plot works and that country's published building permit. It leaves out the land, the contractor's fee, appliances and the architect's professional fee.
In the list
Cement, steel, sand, ballast, blocks, the roof or a concrete slab, windows, doors, tiles, a framed ceiling, paint, kitchen cupboards, wardrobes, wiring, plumbing, sanitary fittings, a septic tank, a boundary wall, a gate and the trade days.
Two floors add the upper slab, the staircase and the formwork. A concrete roof, as in Egypt and Morocco, replaces iron sheets.
Left out on purpose
The plot of land and the contractor's own fee stay out, so the receipt can be checked against materials. Appliances are out. Where a country has not published a permit tariff, the permit line is shown and not given a guessed price.
The method says the same thing in the house section.