The Kenya published cost band
By SendFair. Updated 2026-11-15.
Kenya publishes a whole-build band for an economy to standard finish that includes a builder's overhead. The calculator shows that band beside its own receipt. The receipt does not include the builder's fee.
Read both numbers
The band on the Kenya page is the published planning range for the floor area you chose. It is labelled as a whole-build rate. It is not the sum of the lines.
The lines are the receipt: materials, trade days, finish, plot works and permits. Adding the contractor's fee on top of the lines can land inside the band. The page does not do that addition for you.
Other countries
Where another country publishes an all-in rate, it is shown the same way and labelled as including a contractor. Ghana and South Africa are examples. The line total remains the receipt.